ORASCOM Bazian 

Power Plant 72MW

4x18V48/60 MAN Engines

Bazian, Sulaymaniyah, Iraq

ESCOM initially proved its professional quality and specialization in the sector with the successful operation on Erection and Commissioning works of Bazian Power Plant. Two engines from Birlik Power Plant and two engines from Batman Power Plant were relocated, transported, re-erection, re-designed adapted automation and protection systems and piping, which all is carried out by its own team against the toughest challenges in Northern Iraq / Suleymaniyah.

Erection Works

Engines   and Alternators foundation preparations
Concrete base alignment
Engine frame and oil sump assembling
Generator alignment and fixing
All piping and cabling works
Auxiliary modules installation
Exhaust gas and waste heat boiler installation
Pump House Equipment Installation
Tanks Installation
Radiators, coolers and cooling towers
Water Treatment Instruments Installation

Design & Engineering

  • MV and   LV distribution panels

  • Engines safety and control panels

  • Piping and flow calculations

  • Adaptations of the different systems into common target

  • Adaptation and upgrades of Fuel Oil on Separators, Booster Units and Engines to be used as main consumable instead of Diesel Oil

Supervision and Commissioning

  • 132/11   kV Substation

  • Engines and auxiliaries Commissioning

  • Flushing, pickling and acid baths of the piping

  • Chemical formation of the operating medias

  • Alternators Commissioning

  • Calibration of the instruments

  • Alarms and Safety Checks

  • Functionality Checks

  • Test and Reliability Run of the Power Plant

  • Hand Over procedures

Operation

For 7 years, ESCOM operating the plant in island mode, with %97 efficiency. 24 hrs. 

  • uninterrupted clean power production in island mode 

  • Preventive and protective maintenance interferences on time.

  • Keeping all power plant systems and equipments in service

  • Reporting of power production and consumption of fuel, lub-oil, water, chemicals and other consumables 

  • Cost analysis reports

Maintenance

  • 132/11 kV Substation Step-up Transformers 

  • Engines all planned maintenance. (6000, 12000, 24000 and major 36000 running hrs). 

  • Unplanned maintenances in a professional way, minimizing the costs of spare parts troubleshooting.

  • Performing the maintenance as quick as possible without causing any power loss interfering the unexpected breakdowns by offering cost effective and rapid solutions

Equipment Supply

ESCOM supplies spare parts to the Lafarge, in fastest way.  All parts are delivered in time and ready to use.