LAFARGE Tasluja Power Plant 12MW

 

2x12V32/40 MAN Engines

Suleymaniyah/IRAQ

ESCOM initially proved its professional quality and specialization in the sector with the successful operation on Erection and Commissioning works of Lafarge Power Plant. Engines were relocated, transported, re-erection, which all is carried out by its own team against the toughest challenges in Northern Iraq / Suleymaniyah.


Erection Works

Engines and Alternators foundation preparations
Concrete base alignment
Engine frame and oil sump assembling
Generator alignment and fixing
All piping and cabling works
Auxiliary modules installation
Exhaust gas and waste heat boiler installation
Pump House Equipment Installation
Tanks Installation
Radiators, coolers and cooling towers
Water Treatment Instruments Installation

Design & Engineering

MV and LV distribution panels
Engines safety and control panels
Piping and flow calculations
Adaptations of the different systems into common target

Supervision and Commissioning

Engines and auxiliaries Commissioning
Flushing, pickling and acid baths of the pipings
Chemical formation of the operating medias
Alternators Commissioning
Calibration of the instruments
Alarms and Safety Checks
Functionality Checks
Test and Reliability Run of the Power Plant
Hand Over procedures

Operation

For 7 years, ESCOM operating the plant in standby mode, in order to run as needed.
Preventive and protective maintenance interferences on time
Keeping all power plant systems and equipment in service
Reporting of power production and consumption of fuel, lub-oil, water, chemicals and other consumables Cost analysis reports

Maintenance

Engines all planned maintenance.
(6000, 12000, 24000 and major 36000 running hr)
Unplanned maintenances in a professional way, minimizing the costs of spare parts troubleshooting
Performing the maintenance as quick as possible without causing any power loss
Interfering the unexpected breakdowns by offering cost effective and rapid solutions

Equipment Supply

ESCOM supplies spare parts to the Lafarge, in fastest way.
All parts are delivered in time and ready to use.